SUMGAIT REN – KHIZI AND BAGHLAR
Some repair – restoration and reconstruction work were implemented at TL by 6 and 10 kV, by the way at transformer points by the collaborators of “Khizi” and “Baghlar” Electric Networks included to service territory of Sumgait REN LLC, one of big enterprises of “Azerenergy” JSC. At the same time, the spot – checks were carried out by subscribers in order to prevent of violations of rule of electric power.
Installation of SIL type cables, construction of meters, packing of meters into the boxes, at the same time, carrying out of maintenance repair work at the s/s located at Khizi city, Findighan village, Gilezi and Altiaghaj settlements in order to prevent of accidents, making of bended stands, stretching of wires, construction of one fazed meters by the engineers of Khizi electric network were implemented.
The engineers of “Baghlar” Electric Network one of enterprise of “Sumgait” REN LLC were assiduously try during the first quarter of the current year. Repair – restoration, changing, renewing work were implemented at TL by 6 and 10 kV. So that, damaged stands were changed at TL, bended stands were made, wires were stretched, different setting transformers were maintenance repaired, oil circuit breakers of different feeders were capital repaired.