PRELIMINARY MEASURES ARE CARRIED OUT
Lots of measures are carried out at distribution and transmission networks during summer. Hot summer of this year is increased our care and responsibility. Necessary measures are operated in the line of preventing of extreme loading and high weather temperature. It was noted in the information given by “Saatli Electric Network” (EN) to the Press – release of “Azerenergy” JSC.
As the source informed, about 2,9 km distance of “Nerimanov – Veten”, “Komplex”, the II “Sheher”, “Moskva” TL by 10 kV, “Seyidoba”, “Garajalar” TL by 6 kV and at others were repaired at the EN service territory. At the same time, about 3,7 km of the lines by 0,4 kV belonging to the balance were also repaired. These type of work were implemented at “Kamalli”, “Mezreli”, “Sarjalar” and at other lines.
Lets` noted that, different setting repair work were implemented in order to strengthened stability of distribution network and different powerful 30 transformers were repaired and put into operation.
Lets` noted under the information given by the source, at present measures plan is continued in accordance to plan – graphic.
Under the information given by the source, violations of rule of electric power of 15 consumers were discovered in May of the current year and use value of more than 304 00 kWh loosed electric power was restored. The payment of this sum was repaid (18 00 manat) and the payment of the debtor debts of last months were also achieved.
It should be noted that, 226 infringements were observed during 5 months of 2012 and more than 707 00 manat use value of about 1 million 1787 00 kWh loosed electric power was restored. About 60 % of this sum was repaid as a result of carried out measures and relevant measures are operated in the line of repaying of the remainder sum.
By the way, according to the information given by the sources, there are still observed use of electric power by the edge line and most of them belongs to private consumer group.