ENERGY SUPPLY OF FUZULI IS IN THE CENTER OF THE ATTENTION

Image

 

Energy supply of Fuzuli region located at front is in the center of the attention.

According to the information given by Fuzuli Electric Network to the Press – release of Azerenergy JSC, at present, there are 22 villages and 17 settlements were freed.  All work were executed in the line of preparation work to autumn – winter season. So that, capital and maintenance repair work were implemented at oil circuit breakers, current and tension transformers of all equipments of s/s by 110 kV. Ogorg By the way, there are 11 high tensioned s/s at the region. 2 of them are 110 kV, 9 of them are 35 kV. 680 transformers are operated under the network.

Lets` noted that,  maintenance repair work was implemented at the lines by 10-0,4 kV. Changing of the cables, disconnectors, insulators are carried out where necessary.  Electric power supply of Gayidish and Orengala settlements are in much more level.

Lets` noted that, the scarf was decreased in comparison with last years. And it makes opportunity for increasing of electric power quality, stretching out of exploitation level.

The stands were substituted with much more quality ones, at the same time, installing of some SIL type meters and installing of smart – card meters were implemented at Boyuk Behmenli, Yaghlivend, Kerimbeyli, Babi – Ayagli villages.