SHEKI REN – REPAIR WORK WAS IMPLEMENTED AT THE S/S

Image

Relevant technical measures, repair – restoration work were carried out at s/s and at TL by 35 – 110 kV belonging to Shaki REN” LLC.

So that, 855 insulators were changed, the stands were substituted with new ones at TL by 35 kV of the I, II “Shaki”, the I “Zagatala”, “Ismayilli”, “Gubaxelilli” TL by 110 kV under TL by 35 – 110 kV.

Shaki s/s by 110/35/6 kV, Alibeyli, Jafarabad, Zagatala, Behmedli s/s by  110/35/10 kV, Takhilchiliq sovkhozu, Cheshmeli, Gebele, Yagublu, Goxmug s/s by 35 kV were capital and maintenance repaired.

At this time, 4 power transformers by 110 kV, 2 ones by 35 kV, 1 oil circuit breaker by 110 kV, 11 ones by 35 kV, 17 ones by 10 kV were capital repaired, 1 disconnector by 110 kV, 17 ones by 35 kV,  12 ones by 10 kV were maintenance repaired.

Trainings in the line of fire safety were carried out for 1017 workers, engineering – technical staff and at the s/s by 35-10 kV, 110/10/6 kV and 110/35/10 kV belonging to “Sheki REN” LLC. Beside it fire accident trainings were implemented with operation staff.