MEASURES ARE IMPLEMENTED IN TIME

Image

The device and keep equipment in good condition, the main task is to prevent the loss of energy. Continuity of power supply in the region and the villages of the region in which we serve and our collective responsibility to ensure the high quality of work. Thus, in accordance with the approved schedule of events sequence, performs maintenance and repair work is still preparations  for the autumn-winter season. "

According to the information given by "Mingachevir REN" to "Azerenergy", Gabala, Ahgsu, Barda, Yevlakh, Agjabadi regions, as well as high voltage substations and overhead lines in the city of Mingachevir significantly in the last month of the current and capital repairs will take. 110/35/6 kV "City" 40.5 MVA transformer substation 35 kV number 1 VMD-35-type oil circuit breaker, the second 110 kV "City" line of air circuit breakers, 35.6 kV and three oil switches 6 kV and current repair of two vacuum switches.

110/35/10 kV "Ucar" feeding 35 kV «Seyidler" The key to oil-based air line, the first and second "Goychay" two overhead power lines of 110 kV were repaired and put into the current switch.

110/35/10 kV "master" s volume of work in the last month trying to execute təmircilər team. 10 kV "Jirdakhan" fat switch on the basis of the air line, the key number 2 transformer scheme, one of the two key elements in the current repair of the oil produced.

220/110/10 kV "Gabala" and "Aksu" substation constitute the majority of maintenance. "Gabala" in three pieces of fat "Agsu" after repairs in the three units are connected with a switch.

110/35/10 kV "Barda" and "Khalaj" yarımstansiyasiyalarında access to 10 kV vacuum circuit breakers and oil inlet continues after the repair.

 

110/35/10 kV "Agjabedi" 35/6 kV "career" in the current substation repairs carried out.